In the proton centre at the University Hospital in Leuven, we were engaged to install new, high-tech proton therapy devices. This installation included preparatory welding, hoisting in all components, aligning and mounting them. This was done in a tight space, with a high degree of precision and care.
A fairly complex operation with a 500T gantry crane
The new centre is located in the heart of the hospital. There was therefore not much room for manoeuvre to get the 75-tonne gantry crane and the two cyclotrons or particle accelerators weighing 57 tonnes each into place. Due to the limited space, we used our 500-tonne lifting gantry crane instead of a telescopic crane.
More information about this project is available in our blog:
Press release: Lifthing places and installs cyclotrons at UZ Leuven
Installing medical equipment with Lifthing?
Lifthing has built up a lot of experience and expertise in the installation of delicate medical equipment.
With this project, Lifthing demonstrates that it offers a complete package:
industrial relocations, machine transport, assembly and manipulation, machine moving and transport by loading crane.
Click on the images for a larger view
SECTOR: Medical sector
REGION: Belgium, Leuven
WEIGHT: 75 ton
EXECUTED: 2018