Für alle Ihre Fragen:
info@lifthing.com

+32 3 331 30 53
+32 9 394 44 48

Change of position by two heavy transformers

In the nuclear facility of Doel we have exchanged the position of two transformers. Because we possess an Habil clearance we have permission to work in a highly secured area like the one in Doel. The transformers weighed 200 tonnes each and were located on a site that was under construction. One transformer had been completely tested and had to replace the other. The other transformer just had to be connected, after the two had exchanged positions.

Two transformers changed positions

Because we were not allowed to work with a crane, we had to complete the job with a rail system. We supplied wooden bulkheads, steel plates, rails and a sled system. After we had changed the positions of the two transformers, of course we removed the temporary rails. Yet another assignment that we were able to execute flawlessly.

Would you like more information about an exchange of positions of transformers?

Can we help you too with an industrial move of one or more machines? Feel free to contact the team of Lifthing. Here you can see a few good reasons to place the contract into the capable hands of Lifthing.

Click on the images for a larger view


sectorSECTOR: Machine manufacturer
regioREGION: Belgium, Doel
gewichtWEIGHT: 200 ton
tijdstipEXECUTED: 2017

Meer blogberichten